Projects

All courses have an ongoing master plan and being able to manage projects is of the upmost importance for a successful Golf Course Superintendent. From small, in-house projects to major redesign and rebuilds, I have been through many projects throughout my career. 

Shown below is a transition from a wasted area behind the 7th tee at Country Club of New Bedford that we turned into a pro tee, completed in 2009 in house.

This is the beginning stages of roughing out the drainage for the 5th green at Greenwich Country Club.

IMG_4333

This in-house drainage project drastically changed the left side of 2 fairway(top) and left side of 7 fairway(bottom) at Rolling Hills Country Club.

This bunker reclamation project illustrated how much the turf likes to creep into the sand at Rolling Hills Country Club.